Dunmore – The following work is scheduled for this week throughout Northeastern Pennsylvania.  Anyone wishing to sign up for PennDOT Travel Advisories can do so by emailing James May at jamay@pa.gov.  Follow/like PennDOT on Twitter at 511PANortheast and Facebook at Pennsylvania Department of Transportation (PennDOT).

Please note all work depends on weather conditions.

Wayne County

Short Term

 County Wide- -Sign Repair and Replacement-6/11/2018-6/15/2018-7 a.m. to 3 p.m.

County Wide- -Bridge Work-6/11/2018-6/15/2018-7 a.m. to 3 p.m.

SR 0006-Canaan-Waymart-Single Lane-Pothole Patching-6/11/2018-6/15/2018-7 a.m. to 3 p.m.

SR 0006-Canaan-Waymart-Single Lane-Crack Sealing-6/11/2018-6/15/2018-7 a.m. to 3 p.m.

SR 191-Hancock-Damascus-Single Lane-Pothole Patching-6/11/2018-6/15/2018-7 a.m. to 3 p.m.

SR 196-Easton Tpke-Sterling/Dreher-Single Lane-Pothole Patching-6/11/2018-6/15/2018-7 a.m. to 3 p.m.

SR 507-Mill Creek Highway-Dreher-Single Lane-Pothole Patching-6/11/2018-6/15/2018-7 a.m. to 3 p.m.

SR 0652-Beach Lake Hwy-Berlin/Damascus-Single Lane-Pothole Patching-6/11/2018-6/15/2018-7 a.m. to 3 p.m.

SR 1016-Callicoon Rd-Damascus-Single Lane-Pothole Patching-6/11/2018-6/15/2018-7 a.m. to 3 p.m.

SR 2002-Lakeshore Dr-Paupack-Single Lane-Pothole Patching-6/11/2018-6/15/2018-7 a.m. to 3 p.m.

SR 3001-Tobyhanna-Lehigh-Single Lane-Pothole Patching-6/11/2018-6/15/2018-7 a.m. to 3 p.m.

SR 4041-Elk Lake Dr-Preston-Single Lane-Pothole Patching-6/11/2018-6/15/2018-7 a.m. to 3 p.m.

SR 191-PS3 Bridge Project-  Lane restrictions

SR 371-Bridge replacement-single lane restriction

SR 191-Road closed, new box installation.

SR 2007-Tryon Street Bridge Closed

Long Term

SR 191: The bridge  now open. SR 191 over Dyberry Creek, Honesdale Borough- The work here consists of the rehabilitation of an existing two span I-beam bridge, new retaining wall, temporary pedestrian bridge, temporary traffic signal, traffic detour, rock embankment, sidewalk and curbs, guiderail, and pavement markings. Work is expected to be complete by Spring of 2018. Remaining work which include sidewalks and approach paving will take place in the spring of 2018.  Temporary signal will be taken down in the next two weeks.  

SR 191 (Hancock Highway) bridge, spanning an unnamed tributary to Big Brook Creek in Oregon Township, Wayne County, is scheduled to begin as part of the Pennsylvania Department of Transportation’s (PennDOT) Rapid Bridge Replacement Project.

Construction is expected to begin during the week of March 26 and be complete in early September. During this time, an alternating traffic pattern will be controlled by temporary traffic signals. In the event of unfavorable weather or unforeseen activities, this schedule may change.

SR 371 Pleasant Mt. Wayne Co. Bridge replacement. New traffic pattern scheduled to begin Wednesday April 11 will continue through November 2018.  Single lane traffic. Temporary traffic signals to be used. Work hour are 7:00am to 5:00PM

SR 652, On May 25, traffic on the 1953 Narrowsburg, NY-Darbytown, PA Bridge will switch over to the lane where a new closed-grid deck has been installed to allow completion of the second phase by fall. Four overnight closures will be announced to remove the central steel barrier at the end. The bridge has been reduced to a controlled single lane since August 2013.

 SR 4014 Slide project is currently delayed waiting a permit approval.  There will be a detour in place.