WAYNE COUNTY—The following is a list of scheduled road work for the week ending September 29, 2017.

Short term projects being worked on between 7 a.m. and 3 p.m. include:

SR 170-Creek Dr-Clinton Twp.-SINGLE LANE-Base Repair;

SR 191-Hancock Hwy-Lebanon Twp.-SINGLE LANE-Patching;

SR 196-Sterling Rd-Sterling-SINGLE LANE-Patching;

SR 1002-Calkins Rd-Damascus Twp.-SINGLE LANE-Pipe replacement;

SR 1023-Pine Mill Rd-Damascus Twp. -SINGLE LANE-Patching;

SR 3008-Goose Pond Rd-Sterling/Paupack-SINGLE LANE-Patching;

SR 3028-Owego Tpk-Cherry Ridge/Canann-SINGLE LANE-Base Repair;

SR 4041-Rock Lake Rd-Preston Twp.-SINGLE LANE-Crack Sealing.

Other short term projects include:

SR 191-North Main Honesdale-Bridge Replacement;

SR 3019-Maplewood-Bridge work;

SR 652-Narrowburg Bridge-Rehabilitation;

SR 170-Creek Drive Clinton Twp. Emergency/Immediate Bridge Closure (Aldenville) Detour will be in place;

SR 3028-Slide Repair by Contractor;

SR 3028-Tree Cutting Crew;

SR 370-Slide Repair by Contractor;

SR 191-Slide Repair by Contractor.

Long term projects listed are as follows:

SR 170-Creek Drive Clinton Twp. Emergency/Immediate Bridge Closure (Aldenville) Detour will be in place. Work should be completed by end of September.

SR 191 over Dyberry Creek, Honesdale Borough- The work here consists of the rehabilitation of an existing two span I-beam bridge, new retaining wall, temporary pedestrian bridge, temporary traffic signal, traffic detour, rock embankment, sidewalk and curbs, guiderail, and pavement markings. Work is expected to be complete by October 2017.

SR 652- Narrowsburg Bridge Inc. Mobilization is scheduled to be complete by September of 2018. The proposed work consists of the rehabilitation of a steel deck arch bridge over the Delaware River, along with some other work. The controlled one-lane traffic pattern will continue throughout construction apart from 15 overnight closures needed.

SR 3004- There is a bridge deck replacement project over West Branch of Wallenpaupack Creek (Salem/Sterling Townships) at the intersection of Moon Road, Pond Road, Callapoose Road, and Cemetery Road. The roadway will be completely closed during this time. Work is expected to be complete by September.

SR 3019 over Jones Creek, Lake Township- Construction work here consists of the replacement of a steel I-beam bridge, along with other various projects. This is expected to be complete by November 2017.